ECBCS Bookshop Case Studies

ECBCS Annex Publications - Annex 18 Demand Controlled Ventilation Systems

Case Studies

by L-G Mansson (ed.)
Swedish Council for Buildings Research, D1:1993, 1993, ISBN 91 540 5511 X, 220 pp

Contents

Introduction

  • IEA Annex 18
  • Case Studies

Tests in unoccupied rooms

  • Dispersion pattern of carbon dioxide from human sources (Sweden)
  • Containment distribution and sensor position in a displacement ventilated room (Sweden)

Dwellings

  • H2O Controlled Ventilation in a 9 storey Apartment Building in Namur (Belgium)
  • Humidity Controlled Ventilation on a 10 storey Apartment Building in Schiedam (Netherlands)
  • H2O Controlled Ventilation in a 5 Storey Apartment Building in Les Ulis (France)
  • Performance assessment of a humidity controlled ventilation system in Northern Italy (Italy)
  • A demand controlled balanced ventilation system in an energy efficient dwelling in practice (Netherlands)
  • A Demonstration of Low Cost DCV Technology on Five Canadian Houses (Canada)
  • Advanced Humidity Controlled Ventilation (Germany)

School

  • Demand Controlled Ventilation in a School (Sweden)

Auditoriums

  • Lecture Hall at NTH Trondheim (Norway)
  • CO2 Controlled Ventilation in an Auditorium (Switzerland)

Offices

  • Demand Controlled Ventilation in a boardroom (Canada)
  • Demand Controlled Ventilation in an Office Building in Jonkoping, (Sweden)
  • Demand Controlled Ventilation - Full scale tests in a Conference Room (Sweden)

Appendix: Addresses of National Representatives of Annex 18